1/8

70Kg Vibration welder

Quick Details
Product Code:
HWV-70
OEM:
Available
Sample:
Refuse
Payment:
T/T
Place of Origin:
China
Supply Ability:
10 unit per month
Quick Details
  • Model number
    HWV-70
  • Upper clamp weight
    ≤75KG
  • Welding area
    450cm²
  • Equipment length
    2780mm
  • Equipment width
    1284mm
  • Equipment height
    2390mm
  • The upper die bottom plate
    1140mm
  • Width of upper die bottom plat
    560mm
  • Width of lifting platform
    720mm
  • Travel of lifting platform
    500mm
  • Maximum welding force
    25000N
  • Lifting platform drive
    Hydraulic servo system
  • Equipment weight
    4000kg
  • Input power supply
    AC 380V 3-phase
  • consumed power
    35 KVA
  • output rating
    30KW
  • Resonance tuning
    automatic
  • Welding mode
    Time / depth
OK
Shipping fee
Shipping fee
Inquiry Basket
Contact Supplier

Glove box cover.jpg  Vibration welding fixture 3.jpg
Functional description

  1. This equipment is to apply pressure to the thermal plastic plastic parts installed on the upper and lower fixture, and at the same time, through the left and right linear vibration of the upper products,

The contact parts between the glue parts instantly produce friction heat and melt, and stop vibration when reaching the best melting state, and pressure cooling to achieve the effect of product fusion.

  1. Vibration friction welding mode, can process ultrasonic wave, hot plate welding, rotary welding and other methods can not be processed products. To the product is too large, the material special processing parts, can also be rapid and precise

Welding, so that the welding strength is similar to the strength of the raw material.

  1. 80 welding data stores
  2. Welding stage 6

Welding area: 450cm2

 Air intake manifold.jpg Vibration welding fixture 5.jpg

Machine movement process:

  1. Place the product on the upper and lower die or the lower die
  2. Lifting platform is in place, shock generating welding stage 1 -- welding stage 2 -- welding stage 3
  3. Pressure cooling
  4. Lifting platform descending
  5. Take out the product
Question & Answer